Dalian and NingBo LNG Receiving Terminal
Client: CNOOC and Petrochina Company Limited
Project Type: FEED
Project Location: Dalian and Ningbo, China
Project Status: Completed

Project Summary:
  • LNG receiving dock capacity: 8~16.5x104 m3 LNG carrier
  • Terminal capacity for phase I: 3,000,000 t/year, phase II: 6,000,000 t/year
  • LNG storage tank: phase I, 2 sets of 16x104 m3 each; phase II, 3 sets of 16x104 m3 each

Project Responsibility:

  • Process design: simulation, P&ID
  • Layout drawings for equipments and pipelines
  • Electrical system calculation and primary design
  • Safety and instrument system design support
  • Technical support for civil engineering
  • Compilation of technical reports

Project Highlights:

  • As a engineering partner of Tokyo Gas Engineering (TGE), involved LNG terminal facility design

Contract Award Date: March 2005 and April, 2006
Completion Date: September 2005 and December 2006