Dalian and NingBo LNG Receiving Terminal
Project Summary:
| Client: | CNOOC and Petrochina Company Limited |
| Project Type: | FEED |
| Project Location: | Dalian and Ningbo, China |
| Project Status: | Completed |
Project Summary:
- LNG receiving dock capacity: 8~16.5x104 m3 LNG carrier
- Terminal capacity for phase I: 3,000,000 t/year, phase II: 6,000,000 t/year
- LNG storage tank: phase I, 2 sets of 16x104 m3 each; phase II, 3 sets of 16x104 m3 each
Project Responsibility:

- Process design: simulation, P&ID
- Layout drawings for equipments and pipelines
- Electrical system calculation and primary design
- Safety and instrument system design support
- Technical support for civil engineering
- Compilation of technical reports
Project Highlights:
- As a engineering partner of Tokyo Gas Engineering (TGE), involved LNG terminal facility design
Contract Award Date: March 2005 and April, 2006
Completion Date: September 2005 and December 2006