WenChang 15-1/19-1/8-3 Oil Field Development
Project Summary:
| Client: | Offshore Oil Engineering CO., Ltd |
| Project Type: | Basic Design |
| Project Location: | South China Sea, China |
| Project Status: | Completed |
Project Summary:
- Located in North area of the South China Sea

- WC19-1 is a 4-leg wellhead platforms with 120-130m water depth
- WC15-1 is a 4-leg wellhead platforms with 155m water depth
- WC8-3 is a 4-leg wellhead platforms with 112m water depth
Project Responsibility:
- Structure design of jackets and accessories
- Installation method selection before design started to insure the installation vessel’s capability
- In-place and fatigue analysis
- Pile foundation, design and drivability analysis
Project Highlights:
- Water depth 153.1m a record holder in terms of jacket basic design, the first one in China
- Accurately estimated the jacket weigh before design started, and which is critical for installation method selection (lifting or launching) and installation vessel selection
Contract Award Date: May 2005
Completion Date: September 2005