Revamp for Cryogenic Plants CPUI, KPUI and KPUII
Project Summary:
| Client: | Safer Exploration , Production & Operations Company |
| Project Type: | Basic and Detail Design |
| Project Location: | Republic of Yemen |
| Project Status: | In progress |
Project Summary:
- The capacity expansion from 420 mmscfd to 520 mmscfd for three cryogenic plants CPU I, KPUI and KPUII
- The residue gas must upgrade and meet the Yemen LPG feed gas specification
Project Responsibility:
- Expansion plan study and selection
- Cost investment analysis
- Design basis and design philosophy generation
- Check and verification of existing equipments, electrical, utility system
- RFQ Package development and bid evaluation
- Basic design for the modification
- Detail design for the modification

- Commission, operation manual Technical support for construction and commission
Project Highlights:
- Strict high heat value specification for residue gas product of the plants
- Optimization to maximum product output with minimum investment
Contract Award Date: June 2007
Back