Subsea Manifold Structure Design
Project Summary:
| Client: | OPE Inc. |
| Project Type: | Basic and Detail design |
| Project Location: | Amerade Hess Ceiba, Africa |
| Project Status: | Completed |
Project Summary:
- A subsea manifold for Cameron which is used in Amerade Hess Ceiba oilfield
Project Responsibility:
- Structural design and analysis, including PLEM placement, lifting, recovering, transportation, jumper installation

- Detail design and analysis of lifting legs, connection joints and skirt plates for both vertical and lateral bearing capacity
Project Highlights:
- Heavy manifold seats on soft clay
- Field solution for bearing capacity
Contract Award Date: August 2007
Completion Date: November 2007