Subsea Production System of PanYu 34-1 Gas Field
Project Summary:
| Client: | CNOOC Research Center |
| Project Type: | Feasibility Study |
| Project Location: | South China Sea, China |
| Project Status: | Completed |
Project Summary:
- PanYu 34-1 has 8 gas wells in 3 blocks with 200m water depth
- Critical corrosion caused by high (13.8%) CO2 content
- The subsea system will be tied back PanYu30-1 platform by 37km 12” diameter pipeline
Project Responsibility:
- Field arrangement configuration and total plan development
- Selection and configuration of subsea production facilities and controls system
- Cost estimate and project development plan

Project Highlights:
- Well arrangement of the 8 wells in 3 blocks
- Pipeline protection from CO2 corrosion.
- Long tie-back distance (37m) to platform
Contract Award Date: November 2005
Completion Date: June 2006