Subsea Production System of PanYu 34-1 Gas Field
Client: CNOOC Research Center
Project Type: Feasibility Study
Project Location: South China Sea, China
Project Status: Completed

Project Summary:
  • PanYu 34-1 has 8 gas wells in 3 blocks with 200m water depth
  • Critical corrosion caused by high (13.8%) CO2 content
  • The subsea system will be tied back PanYu30-1 platform by 37km 12” diameter pipeline

Project Responsibility:

  • Field arrangement configuration and total plan development
  • Selection and configuration of subsea production facilities and controls system
  • Cost estimate and project development plan

Project Highlights:

  • Well arrangement of the 8 wells in 3 blocks
  • Pipeline protection from CO2 corrosion.
  • Long tie-back distance (37m) to platform

Contract Award Date: November 2005
Completion Date: June 2006