BAJIAOTING Oil Filed Development
Project Summary:
| Client: | CNOOC Donghai Co., |
| Project Type: | FEED |
| Project Location: | East China Sea, China |
| Project Status: | Completed |
Project Summary:
- Built a new four-leg wellhead platform with work over rig, living quarters and an oil & gas production facilities.
- Connecting with the existing DDP platform through subsea pipelines and cable.
Project Responsibility:
- Process system simulation and PFD ,PID development
- Selection of mechanical Equipments
- Design of platform structure and Jacket
- Design of the subsea pipeline and cable

- Interface defining and design for the work over rig system
- Prepared bid documents for EPC package, long lead equipment package
- Conducted environmental protection, safety analysis and cost estimate
Project Highlights:
- The first basic design project of RICHTECH where it attended the international bidding and obtained the contract successfully.
- The first time PDMS used in CNOOC engineering design
- High CO2 content in gas phase
Contract Award Date: March 2004
Completion Date: July 2004