BAJIAOTING Oil Filed Development
Client: CNOOC Donghai Co.,
Project Type: FEED
Project Location: East China Sea, China
Project Status: Completed

Project Summary:
  • Built a new four-leg wellhead platform with work over rig, living quarters and an oil & gas production facilities.
  • Connecting with the existing DDP platform through subsea pipelines and cable.

Project Responsibility:

  • Process system simulation and PFD ,PID development
  • Selection of mechanical Equipments
  • Design of platform structure and Jacket
  • Design of the subsea pipeline and cable
  • Interface defining and design for the work over rig system
  • Prepared bid documents for EPC package, long lead equipment package
  • Conducted environmental protection, safety analysis and cost estimate

Project Highlights:

  • The first basic design project of RICHTECH where it attended the international bidding and obtained the contract successfully.
  • The first time PDMS used in CNOOC engineering design
  • High CO2 content in gas phase

Contract Award Date: March 2004
Completion Date: July 2004