Project Summary:
| Client: | CNOOC Research Center |
| Project Type: | Basic Design |
| Project Location: | Bohai Bay, China |
| Project Status: | Completed |
Project Summary:
- Total four platforms in 30m water depth
- LD10-1 CEP 8-leg central platform
- LD5-2 DPP 8-leg drilling and production platform
- LD10-1 CEPA 4-leg wellhead platform
- LD4-2 WHPB 4-leg wellhead platform
Project Responsibility:
- Topside facility and LQ design
- RFQ preparation for EPC, long term equipment

- Topside and jacket structural design
- Environmental and safety assessment
- Construction and installation cost estimation
Project Highlights:
- High emulsion content, heavy oil
- Floating ice, low temperature environmental
- The project was award for “Project Manager” prize of year 2003.
Contract Award Date: March 2003
Completion Date: December 2003