LD4-2/5-2/10-1/4-2 Oil Field Development
Client: CNOOC Research Center
Project Type: Basic Design
Project Location: Bohai Bay, China
Project Status: Completed

Project Summary:
  • Total four platforms in 30m water depth
    • LD10-1 CEP 8-leg central platform
    • LD5-2 DPP 8-leg drilling and production platform
    • LD10-1 CEPA 4-leg wellhead platform
    • LD4-2 WHPB 4-leg wellhead platform

Project Responsibility:

  • Topside facility and LQ design
  • RFQ preparation for EPC, long term equipment
  • Topside and jacket structural design
  • Environmental and safety assessment
  • Construction and installation cost estimation

Project Highlights:

  • High emulsion content, heavy oil
  • Floating ice, low temperature environmental
  • The project was award for “Project Manager” prize of year 2003.

Contract Award Date: March 2003
Completion Date: December 2003